Case Studies

1. The Benefit of REL’s Metal Matrix Composites

The Problem:
A Fortune 500 company was seeking a replacement for a 300 series stainless component.

REL’s Solution:
REL produced a Metal Matrix Composite component as a direct replacement of 300 series stainless.

The Results:
In this one component alone, the company received a MMC component that saved them weight, improved the wear resistance and dimensional stability and most importantly, will save them over $1.5 million/per year. By switching to REL manufactured MMC components, this company was able to reduce costs and create an efficient product with a high return on investment.

2. Recommendation from Chet Van Aken:

“Adam and REL have handled the design and installation of three major equipment installations for us in the last six months. I am glad we found them, their work is creative, innovative and robust using the latest technology. REL is a pleasure to work with, they are on time, responsive and willing to put in the effort effort necessary to meet our demanding requirements. I will be asking them to bid on many projects in the future.”

Service Category: new equipment design/installation
Year first hired: 2009 (hired more than once)
Top Qualities: Great Results, On Time, Creative